Ports, Jetties and Island Development
Infrastructure development in Mauritius
Animation completed in 2018
Description: Agalega Island infrastructure and Runway development
Client Objective: Explain the construction methodology
Actual Duration: 5 minutes
Client Name: Afcons Infrastructure Ltd.
Construction of Cargo berths at Kandla Port - Gujarat,India
Animation completed in 2017
Description: Construction of 14th and 16th cargo berths
Client Objective: Explain the construction methodology
Actual Duration: 2 minutes
Client Name: Afcons Infrastructure Ltd.
Charra Breakwater Construction at Kandla - Gujarat,India
Animation completed in 2017
Description: Construction of an offshore breakwater at Charra
Client Objective: Explain the construction methodology
Actual Duration: 13 minutes
Client Name: Afcons Infrastructure Ltd.
Design & Construction of the Dry Dock for Indian Navy - Mumbai,India
Animation completed in 2015
Description: Design and construction of a Dry Dock at Bombay Docks for the Indian Navy
Client Objective: To show how a dry dock functions, to show a new larger dry dock is to be constructed over the existing one. To accommodate India's premier naval carrier INS Vikramaditya. Presented to the Honourable P.M. Mr. Narendra Modi by HCC and Indian Navy
Actual Duration: 5 minutes of walkthrough + 5 minutes of construction
Client Name: Afcons Infrastructure Ltd.
Proposed design & Construction of a Gas supply base - Suai,Indonesia
Animation completed in 2015
Description: Proposed Design and Construction of a Suai Gas Supply Base at Timor Leste
Client Objective: A business pitch to explain the construction and operation of a supply base and showcase expertise in the field of marine engineering
Actual Duration: 20 minutes
Client Name: Afcons Infrastructure Ltd.
Sheet Piling presentation for breakwater for Ports
Animation completed in 2014
Description: Sheet piling concepts presentation by Arcelor Mittal
Client Objective: A presentation by Arcelor Mittal to showcase its expertise in the field of creation of ports through viable sheet piling concepts, right from inception to completion
Actual Duration: 7 minutes
Liquid Natural Gas Stand by jetty - Dahej, Gujarat, India
Animation completed in 2014
Description: Walkthrough and construction of Liquid Natural Gas Stand by Jetty.
Client Objective: To explain the construction and operation of a stand by jetty and client expertise in the field of marine engineering
Actual Duration: 20 minutes
Client Name: Afcons Infrastructure Ltd.